EasyManua.ls Logo

Harmar Mobility Highlander CPL400 - Code Requirements; Site Requirements; Required Tools; Required Materials

Harmar Mobility Highlander CPL400
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Code Requirements
Your lift has been designed to meet ASME A18.1 section 2 and CSA B44/ASME A17.5, with the
addition of certain options. Code requirements for Vertical Platform lifts vary depending on location.
It is the installers responsibility to contact their local code enforcement office and determine all of the
regulations they are subject to. You must do this before installing the Vertical Platform Lift.
Site Requirements
x The lift will require a 115vac 20amp grounded circuit.
x Outdoor Installations will require a GFI protected circuit.
x Only install the lift on a 4 thick , level 3,500 psi reinforced concrete slab.
x Foot Print varies depending on platform size and options.
Required tools
x 1/2" Hammer Drill
x 3/8" Masonry Drill Bit
x Appliance Dolly
x Hammer
x Level
x Measuring Tape
x Socket Wrench Set
Required materials
x 4 Floor anchors
Harmar recommends securing the lift using our Anchor Kit. If you purchase you own
floor anchors they must use 3/8” bolts and have a minimum tensile strength of 6000 LBS.
4

Related product manuals