EasyManua.ls Logo

Harmar Mobility Vantage SL400 - INITIAL CHASSIS POWER-UP AND TEST; Chassis Power Switch and Test Run

Harmar Mobility Vantage SL400
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TEC0017 23Jan2015 P/N: 630-00027-01 revC
SL400 • Vantage Stair Lift Installation Manual
25
Vantage Stair Lift
INSTALLING THE CHAIR
7. On the backside of the chassis, there is an on/o
switch. Cut o and discard the shipping tie on the
switch. [Figure 25-1]
8. Turn the switch to the on position. The unit should
beep once when it has completed booting.
q UNIT DOES NOT OPERATE WHEN SEAT IS ROTATED
q SWIVEL LEVER CONTROL LOCKS INTO PLACE IN ALL THREE POSITIONS
Figure 25-1
Figure 25-2
9. Use the armrest control switch to run the lift down
the rail approximately 30”. [Figure 25-2]
NOTE: Refer to page 31 if the unit does not beep once.

Related product manuals