Section 2:
Installation
Copyright © 2011 Haskris Company 16 www.haskris.com
Version R1600-X-R407C-XXX Instruction Manual Rev00
Table 2 Approximate Volume of Pipe Runs
Table 2 Approximate Volume of Pipe RunsTable 2 Approximate Volume of Pipe Runs
Table 2 Approximate Volume of Pipe Runs
PER/100FT)
5. Vent air at pipe rises during the fill process.
6.
Stop filling piping when glycol solution begins to drain.
7.
Close both the return and supply side flush valves and install the
protective caps back on the ¾” GHT connections.
8.
Open supply and return side isolation valves shown in Figure 2.8
of Section 2.6.2.
2
22
2.
..
.7
7 7
7
Install Checklist
Install ChecklistInstall Checklist
Install Checklist
CHECKLIST MUST BE COMPLETED BY INSTALLER FOR “NO LOAD” START-
UP TO BE SCHEDULED. R1600 CANNOT BE STARTED UNTIL
COMPLETED CHECKLIST HAS BEEN RETURNED VIA FAX TO HASKRIS.
1. Complete Install Checklist located at back of this Manual.
2. Fax completed checklist to Haskris no less than 5 business days prior to
desired R1600 No Load Start-Up date. Haskris will notify the Installer of
the Haskris Authorized Start-Up Agent. Installer will contact Haskris
Authorized Start-Up Agent at least 2 business days in advance. No
Load Start-Up subject to Technician availability. Start-Up will be done
during normal working hours. Installer will issue a Credit Card
Purchase Order to Haskris Start-Up Agent if any items are found
incomplete and resulting in delay of system start-up.
!
!!
!