Haskris Model R1600 Install Checklist
Copyright © 2011 Haskris Company 37 www.haskris.com
Version R1600-X-R407C-XXX Instruction Manual Rev00
Installers Checklist for Haskris
Installers Checklist for Haskris Installers Checklist for Haskris
Installers Checklist for Haskris R1600, S/N HL
R1600, S/N HLR1600, S/N HL
R1600, S/N HL
_____________________________
__________________________________________________________
_____________________________
Project Name ______________________________ Location _______________________________________
Note:
Note:Note:
Note: Checklist MUST be completed for “No Load” Start-up to be scheduled. R1600 cannot be started
until completed checklist has been returned via fax to Haskris no less than 5 business days prior to no
load start-up.
Directions:
Directions:Directions:
Directions:
Fax completed checklist to Haskris (Fax#: 847-956-6595) no less than 5 business days prior to desired
R1600 No Load Start-Up date. Haskris will notify the Installer of the Haskris Authorized Start-Up Agent.
Installer will contact Haskris Authorized Start-Up Agent at least 2 business days in advance. No Load
Start-Up subject to Technician availability. Start-Up will be done during normal working hours. Installer
will issue a Credit Card Purchase Order to Haskris Start-Up Agent if any items are found incomplete and
resulting in delay of system start-up.
Checklist:
Checklist:Checklist:
Checklist:
___ Unit is securely mounted and level.
___ No Refrigeration Service Contactor labels have been affixed to the interior or exterior of the R1600.
___ Clearances for service, ventilation, and access to control panel are adequate per R1600 Instruction
Manual.
___ Electrical service to R1600 per table below (Record Inlet Voltage and Branch Circuit Rating):
___ Confirm proper phase by verifying the red ‘FAULT’ LED is NOT lit on phase monitor. (See Section
2.5.1)
___ Hard copper piping with vents/drains as required and properly supported.
___ Vibration Isolators installed at R1600 on both glycol supply and return lines.
___ Separately fused heat trace covered with suitable thickness of closed-cell, UV resistant insulation on
all piping exposed to low ambient temperatures, as required.
___ Supply/Return lines labeled over insulation.
___
12’ long loop of 1-1/2” reinforced opaque hose between supply and return outlet in equipment
room provided.
___ Supply and return ball valves provided at indoor WW4.
___ Supply side temperature (0-100°F) and pressure (0-100psig) gauges provided at indoor heat
exchanger.
___ Return side temperature (0-100°F) and flow (10-50gpm) gauges provided at indoor heat exchanger.
___ All external piping flushed with water and dried per R1600 Instruction Manual.
___ Leak check performed and no leaks in external piping loop per R1600 Instruction Manual.
Nominal Power:
Nominal Power:Nominal Power:
Nominal Power: 480V-3Ø-60Hz,+5% / -10% MCA: 54.3A, MOCP 70A
Record Voltage at
Disconnect
(V)
L1-L2
Confirm and Record Size of Time
Delay Breaker (Fusing) Supplying
Chiller (A)
L2-L3
L1-L3
!