Haskris Model R1600 Install Checklist
Copyright © 2011 Haskris Company 38 www.haskris.com
Version R1600-X-R407C-XXX Instruction Manual Rev00
___ Glycol manufacturer_________________________Glycol type________________________________
___ Fax copy of receipt or packing list for glycol
___ Water used for glycol mixture: _________Distilled _________De-Ionized
___ System (50 gallon tank and entire piping loop) is filled with gallons of glycol/distilled
water solution.
___ Reservoir is at tank full level.
___ Lines air purged per R1600 Instruction Manual.
___ Glycol solution % (Record actual measurement here).
___ Installer has provided an additional 10 gallons of propylene glycol/distilled water (35% by volume)
to top off system when no-load start-up is performed.
___ Confirm compressor crankcase heater has been energized. (See Section 3.1)
Install Completed By:
Install Completed By:Install Completed By:
Install Completed By:
Company: _____________________________________ Phone: _________________ Fax: __________________
Installer Name: _________________________________________________ Title: __________________________
(Please Print)
Signature: ______________________________ Date: _________________
Requested Start-Up Date: __________________ Time: _________________
Haskris Co.
Haskris Co.Haskris Co.
Haskris Co.
100 Kelly Street Phone: 847-956-6420 Please contact Haskris Co.
Elk Grove Village, IL 60007 Fax: 847-956-6595 if you have any questions.