EasyManua.ls Logo

Hatz 1B30 - 7.2 Performing tests; Before starting

Hatz 1B30
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation and use 1B20, 1B30, 1B40, 1B50
36
HATZ
Manual
Max. permissible forces on the speed control lever and stop pin
F
<
15 N
STOP
76.5°
STOP
F 30 N
M Nm
<
<
START
2.3
7.2 Performing tests
Before starting
Before starting the engine, several tests need to be performed to ensure the
machine is working properly.
Procedure
Step Test
1 The machine is standing securely and on a level surface.
2 The installation location is adequately ventilated.
3 There is a sufficient amount of fuel in the fuel tank (see chapter
7.7 Refueling, page 51).
4 There is a sufficient amount of engine oil in the engine housing
(see chapter 7.6 Check the oil level, page 48).
5 The starter rope of the recoil start does not exhibit abrasion
(hand start).
6 Fill the oil bath air filter (option) with engine oil (see chapter 7.6.2
Oil level in the oil bath filter (option), page 50).
7 No persons are located in the danger zone of the engine or ma-
chine.
8 All safety equipment is in place.

Table of Contents

Other manuals for Hatz 1B30

Related product manuals