EasyManua.ls Logo

Herz BioFire 500 - Biannual Inspection

Default Icon
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance schedule
11
79
11.3 Biannual inspection
Heat exchanger
a) Open maintenance cover of heat
exchanger (HE). If necessary
remove ash.
b) Check HE-cleaning and switch
them on via the aggregate test.
c) If required, the "HE top cover",
the "top insulation" and the "top
HE cover" must also be removed
to clean the heat exchanger
(WT).
d) Remove deposit and check
turbulators visually for damages
and wear.
Flange bearing
Bearing lubricate inside
(see lubrication schedule at page 80)

Related product manuals