3. After powering on the device, check the status of LINK/ACT indicator. If the indicator is lit, the link is
connected. If the indicator is unlit, the link is disconnected. Check the line, and make sure peer
devices have been started.
Chapter 4 Powering on the Device
Before powering your switch, make sure that:
●
The operating power supply is compliant with rated input standard.
●
Port cables and grounding cables are correctly connected.
●
If there is outdoor cabling, connect a lightning rod and lightening arrester to the cable.
Caution
PoE power supply line and strong wire cannot be wired together, otherwise PD equipment or switch
ports will be burnt.
Chapter 5 Device Management
You can manage your devices on the Web.
Note
This chapter mainly introduces how to activate and add the device to the Web.
5.1 On the Web
You can manage your device on the Web. For the first time usage, you must activate the device and
configure the password.
Before You Start
The computer and the device are on the same network segment.
Steps
Note
Take DS-3T3512P as an example. All figures in this manual are for illustration purpose only.
1. Enter the default IP https://192.168.1.64 in the browser address bar.