EasyManua.ls Logo

Hitachi Virtual Storage Platform F900 - Appendix A: Site Preparation Checklist

Hitachi Virtual Storage Platform F900
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A: Site preparation checklist
Verify the availability of each item in the site preparation checklist.
The following tasks might require several weeks to complete:
Acquiring required power outlets.
Arranging for an electrician.
Adding or modifying air conditioning systems.
Making room alterations to accommodate the storage system.
Ordering third-party equipment, such as non-Hitachi racks, network switches, and
host computers to support the Hitachi VSP storage system.
Checklist questions Yes No
Safety
Is the computer room free
of any equipment servicing
hazar
ds, such as electrical
or data cables that obstruct
access?
Does the computer room
have a re-protection
system?
Computer room space planning
Does the existing oor plan
need to be revised to
include the storage
system?
Does the oor plan include
the clearance required for
the oor's load rating?
Does the oor plan include
adequate space for airow
and servicing needs?
Computer room infrastructure
Appendix A: Site preparation checklist
Site Preparation Guide for VSP G/F350, G/F370, G/F700, G/F900 50

Other manuals for Hitachi Virtual Storage Platform F900

Related product manuals