Draining operation for YUTAKI M
YUTAKI M has no drain port factory supplied. It is highly recommended to install a drain port valve attached to the water outlet of the
YUTAKI M unit in order to ease the operation of draining. When the drain port is installed the draining procedure for the YUTAKI M
follows the next steps:
1 Switch OFF the main power of the unit.
2 Close the shut-off valve installed at the water inlet connection (eld supplied).
3 Connect a pipe or a drain hose to the drain port (eld supplied) placed in the water outlet pipe of the unit.
4 Open manually the drain port of the shut-off valve (eld supplied), and collect the water into a bucket (or to a sewage system)
5 Once all the water has been drained, and all maintenance operations have been nished, close again the drain port and open
again the valve of the water inlet pipe to restart the normal operation of the unit.