8.6.2.6  Complementary Heating conguration
Heating Source: 
•  HP Only
•  HP + Heater
•  HP + Boiler
•  HP + Heater  + Boiler (Only for 
YUTAKI S and YUTAKI S COMBI)
Solar combination: 
The solar combination will enable you to heat 
up your domestic water by means of the sun 
whenever the sun is available.
•  Set input 4, output 4 and sensor  (see section 
“8.6.2.9 Setup of inputs, outputs and sensors”)
•  Disabled: No solar Kit is installed.
•  Input Demand: Alternative DHW tank operation is done by solar system or 
YUTAKI unit. Solar input can disable DHW operations done by YUTAKI unit.
 - DHW Hysteresis (OFF, 35 ~ 240 min)
 - DHW Maximum Time (5 ~240 min)
•  Total Control: YUTAKI units controls the solar operation for the system, based 
on different temperatures: DHWT is heated by either the hot water that comes 
from the solar panels or the hot water that comes from the heat pump, depending 
on the solar temperature. See detailed information in “Solar combination - Total 
control”.
Boiler combination: Boiler will only operate if 
unit is in Space Heating or Hot Sanitary Water 
modes. It will always be disabled in any other 
mode (Swimming Pool and Cooling mode). Set 
output 3 and sensor 1 for boiler (see section 
“8.6.2.9 Setup of inputs, outputs and sensors”)
See detailed information in “Boiler combination”
Electrical heater: (Only when heating source 
is congured as HP+Heater or HP+Heater + 
Boiler). See detailed information in “Electrical 
heater”
 
Electrical heater
Operation: 
•  Starting: Space Heating electric Heater is switched ON in 
case of low water temperature and low ambient temperature 
to provide extra capacity to HP.
•  Backup: Space Heating Electric Heater is switched ON 
in case of low ambient temperature (below Bivalent point) 
in order to provide extra capacity to HP at coldest days of 
winter.
Bivalent point: 
•  Electric heater is enabled to operate in case ambient 
temperature goes below this value. Only in case of Backup 
option.
Supply setting offset: 
•  Setting offset for electric Heater. Higher values imply earlier 
stoppage of electric heater and vice versa. Only in case of 
Backup option.
Inter stage time: 
•  Time of Electric Heater phase overlapping when there is 
switch ON/OFF transition from/to phase 1 to/from phase 2. 
Only in case of Backup option.
Waiting time: 
•  Delay time to start Electric Heater 
in case all conditions allow Electric 
Heater to start after HP has been 
started. Only in case of Backup 
option.
Proportional band: 
•  Control to determine how fast setting 
temperature is going to be reached. 
Higher values imply fast achievement 
of water setting point and therefore 
higher utilization of heater.
Reset factor: 
•  Used to guarantee setting temperature 
achievement without surpassing 
its value. Higher values imply less 
utilization of heater.
YUTAKI CASCADE CONTROLLER
PMML0510 rev.1 - 10/2019
136