4 INSTALLATION
4.1 Pre-installation for using in General Service
Verify the actuator’s nameplate to ensure correct model number, torque output, operating speed, voltage and
enclosure type before installation or use.
It is important to verify that the torque output of the actuator is appropriate for the torque requirements of the
valve and that the duty cycle of the actuator is appropriate for the intended application.
4.2 Actuator Mounting
Note:
Prior to mounting, the actuator must be checked for any damage
Damaged parts must be replaced by original spare parts
Mounting is most easily done with the valve shaft pointing vertically upward. But mounting is also possible in
any other position; the actuator may be mounted in any position.
WARNING:
Read this installation, operation and maintenance manual carefully and
completely before attempting to install, operate, or troubleshoot the
actuator.
CAUTION:
Do not attempt to work on your HQ005 actuator without first shutting off
the incoming power
Do not attach ropes or hooks to the hand wheel for the purpose of lifting
by hoist