REQ'D 8 HRS. 200 HRS. 600 HRS. 1200 HRS.
* EXTERIOR CABLES
Inspect equipment output
cables X
Inspect AC input cables X
Check cable connections
(internal) X
* CONTROLS AND
INSTRUMENTS
Check voltmeter functioning X
Check ammeter functioning X
Check fan thermostat
operation X
Check indicating lights X
Check starting current
limit functioning X
Check overload thermostat X
Check printed circuit
control board X
Check all output contactor
contacts X
Check power input contactor
contacts X
Check voltmeter & ammeter
accuracy X
Check all wiring and
connections X
Inspect and clean general
(light duty) X
Inspect and clean general
(severe duty) X
* Suspicious performance occurrence overrides timetable given.
Inspection/Check Schedule
Figure 1
OM-2010
April 10/89 Revised 3-2
Page 3