EasyManuals Logo

Hobart HL400 User Manual

Hobart HL400
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
– 4 –
INSTALLATION
UNPACKING
Immediately after unpacking the mixer, check for possible shipping damage. If this machine is found
to be damaged after unpacking, save the packaging material and contact the carrier within 15 days of
delivery.
LOCATION
Prior to installation, test the electrical service to assure that it agrees with the speci cations on the machine
data plate.
Place the mixer in its operating location. There should be adequate space around the mixer for the user to
operate the controls and to install and remove bowls. The area above and to the rear of the mixer should
allow the top and back covers to be removed for routine maintenance and servicing.
Once in position, the mixer must be leveled:
Remove the two top cover screws and the top cover.
Place a level on the top rim (Fig. 1). Slide shims under the base contact surface of the mixer as
required to level it front-to-back and side-to-side.
Do not replace the top cover until installation is completed.
Lubrication
This mixer is shipped with grease in the transmission. Refer to Lubrication on page 14 for applicable
lubrication procedures.
Fig. 1
HL400 Technical Manual Page 12 of 80

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hobart HL400 and is the answer not in the manual?

Hobart HL400 Specifications

General IconGeneral
BrandHobart
ModelHL400
CategoryMixer
LanguageEnglish

Related product manuals