EasyManua.ls Logo

Honeywell ControlEdge 900A16-0103

Honeywell ControlEdge 900A16-0103
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
For more information about each I/O module wiring, see "Terminal
Block-to-Field (Signal) Wiring" in the ControlEdge 900 Platform
Hardware Planning and Installation Guide.
I/O network Topology
ControlEdge PLC can be configured as a redundant controller system
or non-redundant controller system. It includes provisions for
communication via Ethernet with host systems and the Ethernet ports
provide a layer of protection against cyberattacks. Honeywell
recommends use of Solarwinds and/or Honeywell Risk Manager to
detect unintended and excess network traffic.
ControlEdge PLC supports star and ring I/O topologies for I/O
communication.
Star Topology
The following diagram shows an example of the star topology. A
switch is required for this topology.
Chapter 3 - Hardware

Table of Contents

Related product manuals