ID2000 Series Installation & Commissioning Manual
Commissioning
48997-433-000-5, Issue 5
May 2010
8.7 Volt-free Contact Output Option
Two ID2000 Series control panel sounder circuits, i.e.
sounder circuits 3 and 4, can be configured to provide a
volt-free, normally-open or normally-closed contact.
For either sounder circuit, the configuration changes are
carried out on the Base PCB simply by moving upto two
jumper links and removing the sounder circuit’s
associated fuse. The link setting and fuse removal
instructions are defined in the table below. These
changes must only be made with the system powered
down. The changes become effective automatically on
power-up.
Output
Remove
Fuse:
Remove
Fuse:
Sounder 3
Sounder 3
Sounder 4
Sounder 4
Fit Jumper
Links over:
Fit Jumper
Links
over:
JP22,
JP24,
JP26
JP22,
JP24,
JP26
JP23,
JP25,
JP27
JP23,
JP25,
JP27
For
Normally
Open
For
Normally
Open
For
Normally
Closed
For
Normally
Closed
F3
F4
JP14
JP14
JP15
JP15
NO
NO
NO
NO
NC
NC
NC
NC
EN54-2 : 8.2.5a/b/8.2.4f.
Outputs configured as
volt-free contact are not
monitored, so are not
suitable for use to activate
fire alarm devices such as
sounders, fire alarm
routing equipment, or fire
alarm protection
equipment.
8.8 Repeaters
Commission the repeaters as described in the repeater
manual.
8.9 Configuration and Handover
After all external wiring has been connected to the panel
and the status is ‘NORMAL’, the panel can be configured
for the particular system requirements. Information on
configuring the panel is given in the ID2000 Series Panel
Configuration Manual (ref. 997-435-XXX).
After configuration has been completed and any faults
revealed have been rectified, the system will be ready
for commissioning tests, as required by the appropriate
standards, prior to handover to the user.
8.10 System Test
On completion of all commissioning procedures
described in this section, you must now perform:
a. Zone walk tests
b. Control output tests
8.10.1 Zone Walk Test
Refer to the ID2000 Series Operating Manual (ref. 997-
434-000-X) Section 4.8.1, Zone Walk Test for further
details.
8.10.2 Control Output Test
Refer to the ID2000 Series Operating Manual (ref. 997-
434-000-X) Section 4.8.2, Control Output Test for
further details.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell NOTIFIER ID2002 and is the answer not in the manual?

Honeywell NOTIFIER ID2002 Specifications

General IconGeneral
BrandHoneywell
ModelNOTIFIER ID2002
CategoryControl Panel
LanguageEnglish

Related product manuals