50
MAN0530 Issue 10 - 11/09 Searchline Excel
2104M0506
3. INSTALLATION AND OPERATION
SEARCHLINE EXCEL: INSTALLATION CHECK LIST 2104P1003
CUSTOMER/OPERATOR
SITE/FACILITY
SYSTEM TYPE: SR MR LR OPERATING RANGE
GAS TABLE: METHANE ETHANE PROPANE BUTANE ETHYLENE PROPYLENE BUTADIENE
PENTANE PROPYLENE OTHER
DETECTOR LOCATION:
TAG NO. (RX): TAG NO. (TX):
SER NO. (RX): SER NO. (TX):
MOD STATE (RX): MOD STATE (TX) CERTIFICATION:
CHECK/TEST RECIEVER CHECK/TEST TRANSMITTER
Mount Rigidity Mount Rigidity
Vibration: Vibration:
Excess Heat: Excess Heat:
Supply Voltage: Supply Voltage:
Earthing: Earthing:
RFI/EMC: RFI/EMC:
Contaminants: Contaminants:
BEAM OBSTRUCTIONS / BLOCKS:
(cont.)
TEST FILTER: Response: Pass: Fail:
4-20mA LOOP INTEGRITY Pass: Fail: Untested:
FAULT / WARNING LOG: Clear: Faults/Warnings:
(cont.)
INSTALLATION SATISFACTORY: Yes: No: Signed:
INSTALLED BY (PRINT) DATE:
IF INSTALLATION UNSATISFACTORY, REASONS
RECOMMENDATIONS
CUSTOMER NOTIFIED:
SYSTEM STATUS: Operational: Nonoperational: