Wheels
Wheels
Check for damage (cracks, etc.) Daily
Check fastening / retighten wheel nuts - see above see above
Check air pressure
• Undercarriage: 520 / 85 R 38: 2.8 bar
• Support wheels: 15.0/55 - 17 10 PR: 2.6 bar
Daily
Secure the machine properly before changing tyres.
Bearings of carrying axle journal Check clearance and adjust if necessary
(must only be carried out by an expert workshop)
120 h /
6 months
Support
Check for damages, repair if necessary or replace Daily
Safety installations
Lighting and warning boards Check condition and function Daily
Warning and safety stickers Check that they are in place and legible Daily
At the end of the season
Complete machine Perform care and cleaning work; do not spray plastic parts with oil or similar
Spray the piston rods of the hydraulic cylinder with a suitable corrosion
protection agent
Check all screw and plug-and-socket-connections for rm seating (see
torque table)
Check frame and connecting parts for condition and rm seating
• The maintenance interval Daily designates maintenance on each working day before working with the machine.
• Follow additional maintenance notes in the respective chapters.
71