EasyManua.ls Logo

HP 6100

HP 6100
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Create recovery plans
Create recovery plans on the recovery site. A recovery plan is a list of steps the SRM follows on a
protected site to switch operation from the protected site to the recovery site during a disaster (or test).
For more information on creating recovery plans, see the VMware Site Recovery Manager
Administration Guide.
EVA Virtualization Adapter administrator guide 19

Table of Contents

Other manuals for HP 6100

Related product manuals