EasyManua.ls Logo

HP Aruba 6400 Series

HP Aruba 6400 Series
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
CAUTION: Handle your Aruba 6400 switch management modules with care. Rough or careless
handling can damage the modules and result in unplanned down time.
1. Put on an ESD wrist strap and properly ground it on the switch. See ).
2. Remove a management module slot cover (from slot 1 or 2) and store it for future use.
3. Install a management module in the uncovered slot.
3
3
1
2
2
4. Tighten the screws at each end of the module.
Install line modules
Procedure
CAUTION: Handle your Aruba 6400 switch line modules with care. Rough or careless handling
can damage the modules and result in unplanned down time.
1. Put on an ESD wrist strap and properly ground it to the chassis. See Protect the switch and
components from damage caused by ESD (Electrostatic discharge).
2. Remove a slot cover from a line module slot and store it for future use.
72 Aruba 6400 Switch Series Installation and Getting Started
Guide

Table of Contents

Related product manuals