Hardware options installation 56
10.
Attach the capacitor pack to the air baffle.
11. Install the PCI riser cage (on page 29).
12. Install the full-length expansion board retainer (on page 30) if any full-length expansion boards are
installed.
13. Install the access panel (on page 26).
14. Install the server into the rack ("Installing the server into the rack" on page 36).
15. Power up the server (on page 24, "Powering up and configuring the server" on page 37).
Optical drive option
1. Power down the server (on page 24).
2. Extend the server from the rack (on page 24).
3. Remove the access panel (on page 25).
4. Remove the existing media drive option or blank.