46
installation site gas saturation, 2
installation site humidity, 2
installatio
n site temperature, 2
lightning p
rotection, 3
setting con
sole terminal parameters, 21
sit
e
cleanliness, 2
cooli
ng requirements, 3
dust con
centration, 2
examination, 2
gas
saturation, 2
humidity
, 2
temperature, 2
startup pro
cess, 22
T
techni
cal specifications, 32
4G anten
na, 33
LED, 34, 34
temperature
installation site requirements, 2
site co
oling requirements, 3
terminal
setting console parameters, 21
trouble
shooting garbled display, 26
tools (in
stallation), 4
trouble
shooting
3G/4G antenna failure, 26
3G/4G SIM card failure, 26
garbl
ed terminal display, 26
no res
ponse from serial port, 26
power supply
failure, 25
reset button u
sage guidelines, 27
rest
oring factory settings, 27
route
r installation, 25
U
usa
ge guidelines
reset button, 27
V
ventilation (in
stallation site), 3
verifying installation, 22
W
wall (router installation), 9
workb
ench (router installation), 8