EasyManua.ls Logo

HPE StoreFabric M-Series

HPE StoreFabric M-Series
131 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46 User Manual
2.6.2.5 SN2010M Splitting Options
2.7 Initial Power On
Each system’s input voltage is specified in the “Specifications” chapter. The power cords should
be standard 3-wire AC power cords including a safety ground and rated for 15A or higher.
Step 1. Plug in the first power cable.
Step 2. Plug in the second power cable.
Step 3. Wait for the System Status LED to turn green.
Step 4. Check the System Status LEDs and confirm that all of the LEDs show status lights consis-
tent with normal operation (initially flashing, and then moving to a steady color) as shown
in
Figure 48 below. For more information, refer to “LEDs”.
The system platform will automatically power on when AC power is applied. There is
no power system. Check all boards, power supplies, and fan tray modules for proper
insertion before plugging in a power cable.
It may take up to five minutes to turn on the system. If the System Status LED shows
red after five minutes, unplug the system and call your HPE representative for assis-
tance.

Table of Contents

Related product manuals