Figure 16: HPE StoreOnce 5650 System rack layout
Item Description
1 JBOD 4: Third capacity upgrade kit. Install above JBOD 2.
2 JBOD 2: First capacity upgrade kit): Install above the server.
3 Server node
4 JBOD 1: Base enclosure. Install under the server.
5 JBOD 3: Second capacity upgrade kit. Install under JBOD 1.
5. Install two power cords for the server and each storage enclosure.