3. In the System section, select the Maintenance mode panel.
4. On the Maintenance mode screen, set the Maintenance mode switch to the On position ( ),
and then click OK.
Where to install the enclosure
Before installing the rails, plan where to put the capacity upgrade enclosure in the rack.
The base enclosure that comes with the system (JBOD 1) is installed immediately below the server node.
Install the first capacity upgrade enclosure (JBOD 2) immediately above the server node. Then alternate
below and above the server node as you add capacity upgrade enclosures to the system. A system at
maximum configuration has three storage enclosures below and three above the server node.
1
2
3
4
5
6
7
Figure 28: HPE StoreOnce 5200 System rack layout
Item Description
1 JBOD 6: Fifth capacity upgrade kit. Install above JBOD 4.
2 JBOD 4: Third capacity upgrade kit. Install above JBOD 2.
3 JBOD 2: First capacity upgrade kit. Install above the server.
4 Server node
5 JBOD 1: Base enclosure. Install under the server.
6 JBOD 3: Second capacity upgrade kit. Install under JBOD 1.
7 JBOD 5: Fourth capacity upgrade kit. Install under JBOD 3.
86 Installing capacity upgrade kits