BOILER START-UP REPORT
DATE COMPLETED ________________
1) Fill the
heating
system
Check all piping and gas connections,
verify all are tight
Pressurize system (12 – 15 PSI)
Add water to prime condensate cup
Percentage of glycol in system (0-50%)
Verify near heater piping is properly
pipe
Leak test using locally approved methods
(consult jurisdictional code book)
Check incoming gas pressure (3.5” to 14”
W.C.)
____ in w.c. Static
What is the “drop” on light off (No more
than 1” W.C.)?
____ in w.c. Dynamic
3) Check
combustion
Check and adjust (if necessary) carbon
dioxide content
____% CO2 High Fire ____% CO2 Low Fire
Check and adjust (if necessary) carbon
monoxide content
____ppm CO High Fire
____ ppm
CO
Low Fire
4) Verify
system
operation
Turn up aquastat on storage tank to verify
wiring connections
5) Record
ionization
current
Check uA reading at d7 on the status
menu (see start-up section)
____ uA High Fire ____ uA Low Fire
6) Indirect
water heater
Verify safety and operation of the indirect
water heater, record settings
____de ____dh
7) Convert
the heater
If necessary, convert the heater to the
proper gas type
Locate the stickers in the appropriate
locations on the heater
Verify combustion settings after gas
conversion, Carbon Dioxide
____% CO2 High Fire ____% CO2 Low Fire
Verify combustion settings after gas
conversion, Carbon Monoxide
____ppm CO High Fire
____ppm
Low Fire
Mail in the conversion registration
8) System
Setting
Verify system settings
___ de ___ dh
Notes: