Item Check Method Maintenance
Interval
System running
status
The inverter is not damaged or
deformed.
The inverter operates with no
abnormal sound.
When the inverter is running,
check whether all inverter
parameters are correctly set.
Once every 6 months
Electrical
connections
Cables are securely connected.
Cables are intact, and in
particular, the parts touching
the metallic surface are not
scratched.
Check whether the sealing caps
of idle DC input terminals fall
o.
Check that the idle COM and
USB ports are locked by
waterproof caps.
The rst inspection is
6 months after the
initial commissioning.
From then on, the
interval can be 6 or
12 months.
Grounding
reliability
Ground cables are securely
connected.
The rst inspection is
6 months after the
initial commissioning.
From then on, the
interval can be 6 or
12 months.
Removing the
bae of the air intake vent
Figure 8-2 Removing the
bae
SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1
User Manual
8 Maintenance
Issue 05 (2020-08-30) Copyright © Huawei Technologies Co., Ltd. 85