EasyManua.ls Logo

Huawei iSitePower-M V100R002C00 - User Manual

Huawei iSitePower-M V100R002C00
197 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User
Manual (MAP05A1, MAB05B1)
Issue 01
Date 2022-07-15
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Huawei iSitePower-M V100R002C00 and is the answer not in the manual?

Huawei iSitePower-M V100R002C00 Specifications

General IconGeneral
ModeliSitePower-M V100R002C00
CategoryInverter
Output Frequency50/60 Hz
Cooling MethodNatural Convection
Storage Temperature-40°C to +70°C
Protection FeaturesOverload, Short Circuit

Summary

About This Document

Purpose

Describes the iSitePower-M system's overview, installation, commissioning, maintenance, and technical specifications.

Intended Audience

Lists the professionals for whom this document is intended.

Symbol Conventions

Defines symbols used in the guide for safety and information.

Change History

Safety Precautions

General Safety

General safety instructions for installing, operating, and maintaining the equipment.

Personnel Requirements

Details qualifications and training needed for personnel handling the equipment.

Electrical Safety

Covers grounding requirements and general electrical safety practices.

DC Operation and Cabling Safety

Safety precautions for DC power connection and cable routing.

ESD Precautions

Precautions regarding electrostatic discharge and wearing ESD gloves.

Battery Safety

Critical safety guidelines for handling, storing, and using batteries to prevent hazards.

Battery Handling and Environment

Basic requirements and personal safety for battery operations.

Battery Installation Requirements

Requirements for safely installing battery modules, checking packaging, and securing connections.

Battery Hazards and Emergency Measures

Information on battery hazards and emergency procedures for leaks or fires.

Battery Leakage, Dropped Battery, and Recycling

Procedures for battery leakage, dropped batteries, flood, and recycling.

Battery Storage Requirements

Guidelines for storing batteries, including environmental conditions and handling.

Transportation Requirements

Regulations and precautions for transporting dangerous goods like batteries.

Installation Environment Requirements

Specifies suitable environments and conditions for installing the battery.

Mechanical Safety

Safety precautions when using ladders, drilling holes, and moving heavy objects.

Commissioning and Maintenance Safety

Safety considerations for commissioning and performing maintenance.

Product Description

Overview

Describes the function and working modes of the iSitePower-M system.

Appearance

Illustrates the external appearance of the system components and LEDs.

System Networking

Details the networking diagram and system configurations.

Label Description

Explains the meaning and purpose of various labels on the equipment.

Components

Power Module

Describes the function and structure of the power module.

Battery Module

Details the specifications and appearance of the battery module.

(Optional) AC Parallel Box

Describes the AC parallel box used for increasing system power.

Application Scenarios

Solar-Only Scenario

Describes the system's operation in a solar-only environment.

Grid Scenario

Explains system operation when connected to the power grid.

Genset-Grid Hybrid Scenario

Outlines system operation with genset and grid power sources.

Solar-Grid Hybrid Scenario

Describes system operation combining solar and grid power.

Solar-Genset Hybrid Scenario

Details system operation with solar, battery, and genset.

Solar-Grid-Genset Hybrid Scenario

Explains system operation with all three power sources.

System Installation

Installation Preparations

Steps to check outer packing and deliverables before installation.

Tools and Instruments

Lists necessary tools and instruments for installation.

Determining the Installation Position

Guidelines for selecting an appropriate installation location.

Installing a Mounting Bracket

Procedures for ground and wall mounting brackets.

Installing Modules

Steps for installing battery and power modules.

Optional Battery Module Installation for Capacity Expansion

Instructions for adding battery modules for increased capacity.

Optional AC Parallel Box Installation

Procedure for installing an AC parallel box for system expansion.

Setting the DIP Switch

Preparing Cables

Cables Delivered with the Product

Lists the types of cables included with the iSitePower-M system.

Cables Prepared by the Customer

Specifies cable requirements for different scenarios (Solar-Only, Grid, etc.).

Electrical Connection

Precautions for Electrical Connections

Safety warnings and general precautions for electrical connections.

Solar-Only Scenario Connections

Instructions for electrical connections in a solar-only setup.

Grid Scenario Connections

Electrical connection procedures for grid-connected systems.

Genset-Grid Hybrid Scenario Connections

Electrical connection steps for systems with genset and grid.

Solar-Grid Hybrid Scenario Connections

Electrical connection details for solar and grid hybrid systems.

Solar-Genset Hybrid Scenario Connections

Electrical connection procedures for solar and genset hybrid systems.

Solar-Grid-Genset Hybrid Scenario Connections

Electrical connection for systems with all three power sources.

Optional Capacity Expansion Cable Installation

Guidelines for connecting cables during capacity expansion.

System Commissioning

System Power-On

Steps to power on the system after installation.

Battery Commissioning

Procedures for commissioning the battery system, including app installation.

System Maintenance

System Power-Off

Procedures and precautions for safely powering off the system.

Routine Maintenance

Checklist and intervals for performing routine system maintenance.

Troubleshooting

Common alarms, their causes, and suggested troubleshooting steps.

Battery Storage and Recharge

Guidelines for storing batteries and procedures for inspection and recharge.

Storage with Low SOC

Managing battery storage with low state of charge to prevent damage.

Frequently Asked Questions (FAQs)

Installation and Cable Preparation FAQs

FAQs on uneven ground, PV cable tools, special cables, and power terminals.

Operation and System FAQs

FAQs on power-on, SOC changes, upgrade issues, WiFi, and battery capacity querying.

Problem Handling and Password Reset

FAQs on general problem handling and resetting passwords.

Technical Specifications

iSitePower-M System Specifications

Environmental and electrical specifications for the iSitePower-M system.

Power Module Specifications

Physical dimensions and mounting details for the power module.

Battery Module Specifications

Physical dimensions and mounting details for the battery module.

AC Parallel Box Specifications

Technical details for the optional AC parallel box.

Preparing Cables and Terminals

Preparing a Cord End Terminal

Step-by-step guide for preparing a cord end terminal.

Preparing an OT Terminal

Instructions for preparing an OT terminal, including crimping and sealing.

Preparing a PV Input Power Cable

Detailed steps for preparing PV input power cables with specific connectors.

Stripping Length

Defines cable stripping lengths for standard and parallel scenarios.

Related product manuals