2.3 System Networking
Figure 2-7 Networking diagram
(A) PV string (B) DC switch (D) Power distribution
box (PDB)
(E) Load (F) DG (G) Power grid
(H) ATS (I) Power distribution
cabinet (PDC)
The system supports capacity expansion and power expansion.
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) 2 Product Description
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 22