Figure 5-16 Rotating the L-shaped sheets on the top cover
Step 2 Install the top cover on the battery module.
Figure 5-17 Installing the top cover
----End
5.5 (Optional) Installing an AC Parallel Box
Prerequisites
In a parallel system, an AC parallel box must be congured.
Step 1 Mark mounting holes.