Figure 8-34 Install the grid detection cable of the ATS
----End
8.3.7 Installing Cables in a Parallel System
8.3.7.1 Installing a Ground Cable for the Parallel Box
Procedure
Step 1 Install a ground cable.
Figure 8-35 Installing a ground cable
----End
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) 8 Electrical Connection
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 105