9.2 Battery Commissioning
NO TICE
When the output voltage system is adjusted, the system is powered o and
then restarted. No manual operation is required.
If there is no AC input, the product will be powered o during the upgrade.
Therefore, you are advised to upgrade the product when AC input is available.
9.2.1 Installing the App
Prerequisites
A mobile phone running Android 8.0 or later is available.
The app cannot be installed on a tablet, folding screen, or landscape screen
device.
Downloading and Installing the NetEco App
Method 1: Search for NetEco in Huawei AppGallery and download the latest
installation package.
Method 2: Scan the QR code to download and install the latest installation
package.
Figure 9-1 QR code
9.2.2 New Site Deployment
Refer to
iSitePower-M App Quick Guide
to perform app commissioning. You can
scan the QR code to obtain
iSitePower-M App Quick Guide
.
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) 9 System Commissioning
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 163