General Requirements
Before connecting cables, ensure that the equipment is intact. Otherwise, electric
shocks or re may occur.
● Ensure that all electrical connections comply with local electrical standards.
● Ensure that the cables you prepared meet local regulations.
● Use dedicated insulated tools when performing high-voltage operations.
DC Operation
Do not connect or disconnect power cables with power-on. Transient contact
between the core of the power cable and the conductor will generate electric arcs
or sparks, which may cause
re or personal injury.
● Before connecting cables, switch o the disconnector on the upstream
equipment to cut
o the power supply if people may contact energized
components.
● Before connecting a power cable, check that the label on the power cable is
correct.
● If the equipment has multiple inputs, disconnect all the inputs before
operating the equipment.
Cabling Requirements
● When routing cables, ensure that a distance of at least 30 mm exists between
the cables and heat-generating components or areas. This prevents damage
to the insulation layer of the cables.
● Bind cables of the same type together. When routing cables of
dierent types,
ensure that they are at least 30 mm away from each other.
● The positions where cables are routed through pipes or holes must be
protected to prevent the cables from being damaged by sharp edges or burrs.
● When the temperature is low, violent impact or vibration may damage the
plastic cable sheathing. To ensure safety, comply with the following
requirements:
– Cables can be laid or installed only when the temperature is higher than
0°C. Handle cables with caution, especially at a low temperature.
– Cables stored at subzero temperatures must be stored at room
temperature for at least 24 hours before they are laid out.