EasyManua.ls Logo

Huawei PowerCube 5000 - ICC Cabinet Components: Bypass Module (BPS)

Huawei PowerCube 5000
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
3 Installing the Cabinet
Copyright © Huawei Technologies Co., Ltd.
1. Drill a hole into the concrete floor using a hammer drill. The hole depth should range
from 52 mm to 60 mm.
2. Slightly tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
3. Partially tighten the expansion bolt.
4. Remove the expansion bolt, spring washer, and flat washer.
Figure 3-2 Drilling a hole and installing an expansion sleeve
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
(5) Expansion nut
(6) Concrete floor
Step 4 Remove the rear panel of the cabinet.

Table of Contents

Other manuals for Huawei PowerCube 5000

Related product manuals