EasyManua.ls Logo

Huawei PowerCube 5000 - Monitoring Unit: SMU02 S Details

Huawei PowerCube 5000
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
3 Installing the Cabinet
Copyright © Huawei Technologies Co., Ltd.
Figure 3-5 Installing the cabinet
Step 7 Install a Parallel System.
1. Install the UPSs in a parallel system using the single UPS installation methods.
2. Unscrew the connecting kits at the front and rear of the cabinet, align them with the
reserved holes that can connect the two SUN2000s and then use screws to tighten the
connecting kits to the cabinet according to the following figures.

Table of Contents

Other manuals for Huawei PowerCube 5000

Related product manuals