PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
6 Installing a BIM
Copyright © Huawei Technologies Co., Ltd.
Figure 6-3 Installing a BIM (battery 1)
Figure 6-4 Installing a BIM (battery 2)
Step 6 (Optional) Reinstall the insulation cover for the battery.
Step 7 Install other BIMs in the same way.
----End
Scenario 2 (Installing on the Battery Side)
Step 1 Remove the insulation cover from a battery.
Step 2 Connect the negative and positive cables of the BIM to the negative and positive terminals of
the battery respectively.