EasyManua.ls Logo

Huawei Quidway S5600 Series - Installing;Removing the Stack Cable; Stack Cable; Installing the Stack Cable; Removing the Stack Cable

Huawei Quidway S5600 Series
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Manual
Quidway S5600 Series Ethernet Switches Chapter 3
Installing the Switch
Huawei Technologies Proprietary
3-11
Note:
The serial ports on PCs do not support hot swapping. Therefore, do not insert or
remove a serial interface cable from a PC that is connected to a switch with power. In
connecting a PC to the switch, first connect the DB-9 connector of the console cable to
the PC and then the RJ45 connector to the switch. In disconnecting them, remove the
RJ-45 connector prior to the DB-9 connector.
3.5 Installing/Removing the Stack Cable
3.5.1 Stack Cable
To stack S5600 series switches, you need to use stack cables to connect the Fabric
ports of switches.
Figure 3-16 Diagram for stack cable
The stack cable for the S5600 series switch can be 0.65 m (2.1 ft.), 1.2 m (3.9 ft) and 5
m (16.4 ft) long. You can choose them according to your need.
3.5.2 Installing the Stack Cable
Step 1: Before you take the cable out of the package, wear an ESD wrist strip and make
sure it is well grounded.
Step 2: Insert the cable plug into the switch Fabric port flatly.
Step 3: Use a Phillips screwdriver or power screwdriver to fasten the captive screws at
both sides.
3.5.3 Removing the Stack Cable
Step 1: Wear an ESD wrist strip and make sure it is well grounded.
Step 2: Use a flat-blade screwdriver or power screwdriver to unscrew the captive
screws at both sides.
Step 3: Unplug the cable plug from the switch Fabric port flatly.

Table of Contents

Other manuals for Huawei Quidway S5600 Series

Related product manuals