Procedure
Step 1 Crimp an OT terminal.
NO TICE
ɲ üѲäàì¯²Êªì¯Ñàý²àý¯Êäìà²ÝݲʪÃȇ
ɲ f¯ü²ìă©ÑàÉ©ìàì¯ÑÊñìÑàà²ÉÝäìà²ÝÑ©ì¯KfìàɲÊÃ²äà²ÉÝ
must wrap the core wires completely. The core wires must contact the OT
terminal closely.
ɲ Ýì¯ý²àà²Éݲʪàý²ì¯¯ìä¯à²ÊÀìñ²ÊªÑà²ÊäñÃì²ÑÊìÝȇf¯
heat shrink tubing is used as an example.
ɲ w¯Êñä²Êª¯ìªñÊȀÝàÑììì¯ßñ²ÝÉÊì©àÑÉ²ÊªäÑà¯ȇ
Figure 5-2 Crimping an OT terminal
(A) Core wire (B) Insulation layer (C) Heat shrink tubing
(D) Hydraulic pliers (E) Heat gun
Step 2 Connect the PE cable.
NO TICE
ɲ Êäñàì¯ìì¯WÃ²äÑÊÊìäñàÃăȇ
ɲ /ì²äàÑÉÉÊìÑñäì¯ಪ¯ìªàÑñÊÝѲÊì©ÑàªàÑñÊ²ÊªȀÊì¯Ñì¯à²ä
a reserved ground point.
SUN2000-(2KTL-6KTL)-L1
User Manual 5 Electrical Connection
Issue 03 (2020-09-15) Copyright © Huawei Technologies Co., Ltd. 36

Table of Contents

Other manuals for Huawei SUN2000-(2KTL-6KTL)-L1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-(2KTL-6KTL)-L1 and is the answer not in the manual?

Huawei SUN2000-(2KTL-6KTL)-L1 Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-(2KTL-6KTL)-L1
CategoryInverter
LanguageEnglish

Related product manuals