EasyManua.ls Logo

Huawei SUN2000-(2KTL-6KTL)-L1 - IPS Check (for Italy CEI0-21 Grid Code Only)

Huawei SUN2000-(2KTL-6KTL)-L1
119 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2.3 IPS Check (for Italy CEI0-21 Grid Code Only)
Function
The Italy CEI0-21 grid code requires an IPS check for the SUN2000. During the
self-check, the SUN2000 checks the protection threshold and protection time of
the maximum voltage over 10 min (59.S1), maximum overvoltage (59.S2),
minimum undervoltage (27.S1), minimum undervoltage (27.S2), maximum
overfrequency (81.S1), maximum overfrequency (81.S2), minimum
underfrequency (81.S), and minimum underfrequency (81.S2).
Procedure
Step 1 On the home screen, choose Maintenance > IPS test to access the IPS test screen.
Step 2 Tap Start to start an IPS test. The SUN2000 detects maximum voltage over 10 min
(59.S1), maximum overvoltage (59.S2), minimum undervoltage (27.S1), minimum
undervoltage (27.S2), maximum overfrequency (81.S1), maximum overfrequency
(81.S2), and minimum underfrequency (81.S1), and minimum underfrequency
(81.S2).
Figure 7-18 IPS test
Table 7-5 IPS test type
IPS Test Type Description
Maximum voltage
over 10 min
(59.S1)
The default maximum voltage over 10 min protection
threshold is 253 V (1.10 Vn), and the default protection
time threshold is 3s.
SUN2000-(2KTL-6KTL)-L1
User Manual 7 Man-Machine Interaction
Issue 03 (2020-09-15) Copyright © Huawei Technologies Co., Ltd. 75

Table of Contents

Other manuals for Huawei SUN2000-(2KTL-6KTL)-L1

Related product manuals