1
1
System Installation
Installation dimensions Chassis dimensions
Copyright © Huawei Technologies Co., Ltd. 2018. All rights
reserved.
Determining the Installation Position
1.1
1. The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all statements,
information, and recommendations in this document do not constitute a warranty of any kind,
express or implied.
2. Before installing the device, read the SUN2000-(30KTL-A, 33KTL, 33KTL-E001, 40KTL) User
Manual for knowledge of product information and safety precautions.
3. Only qualified and trained electrical technicians are allowed to operate the device. Operators
should understand the components and functioning of a grid-tied PV power system and be
familiar with relevant local standards.
4. Before installing the device, check that deliverables are intact and complete against the packing
list. If any damage is found or any component is missing, contact the dealer.
5. Use insulated tools when installing the device. For personal safety, wear insulation gloves and
protective shoes.
6. Huawei shall not be liable for any consequence caused by violation of the storage,
transportation, installation, and operation regulations specified in this document and the user
manual.