Crimping Three Signal Cables
Connecting Signal Cables
Number of Communications
Cables
Click
4
Verifying the Installation
No.
Acceptance Criteria
1
The solar inverter is installed correctly and securely.
2
The WLAN antenna is installed correctly and securely.
3
Cables are routed properly as required by the customer.
4
Cable ties are evenly distributed and no burr exists.
5
The PE cable is connected correctly and securely.
6
The DC switch and all the switches connected to the solar inverter are set to the OFF
position.
7
The AC output power cable, DC input power cables, and signal cable are connected correctly
and securely.
8
Unused terminals and ports are locked by watertight caps.
9
The installation space is proper, and the installation environment is clean and tidy.

Other manuals for Huawei SUN2000-4.6KTL-L1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-4.6KTL-L1 and is the answer not in the manual?

Huawei SUN2000-4.6KTL-L1 Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-4.6KTL-L1
CategoryInverter
LanguageEnglish

Related product manuals