Check Item Check Method Maintenance
Interval
Cables
connections
Cables are securely connected.
Cables are intact, and in
particular, the parts touching
the metallic surface are not
scratched.
Check whether the sealing caps
of idle DC input terminals fall
o.
Unused terminals and ports are
locked by watertight caps.
The rst inspection is
6 months after the
initial commissioning.
From then on, the
interval can be 6 to
12 months.
Grounding
reliability
Ground cables are securely
connected.
The rst inspection is
6 months after the
initial commissioning.
From then on, the
interval can be 6 to
12 months.
Clear vegetation
around the
inverters
Perform inspection and weeding
as required.
Clean the site promptly after
weeding.
Based on the local
wilting season
Figure 8-3 Removing the
bae of the air intake vent
NO TICE
After the cleaning is complete, reinstall the bae plate. Tighten the screws with a
torque of 1.2 N·m.
8.4 Troubleshooting
Alarm severities are dened as follows:
Major: The inverter is faulty or the external environment is abnormal. As a
result, the output power decreases or the inverter stops feeding into the grid.
SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
User Manual 8 Maintenance
Issue 15 (2023-01-31) Copyright © Huawei Technologies Co., Ltd. 117