EasyManua.ls Logo

Huawei SUN2000-75KTL Series - Powering On the SUN2000

Huawei SUN2000-75KTL Series
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 3 Set DC SWITCH 1 (MAIN SWITCH) at the bottom of the solar inverter chassis to
ON. When you hear a click, the switch is ON.
Step 4 Check the status of the PV connection indicator. If it is steady green, set DC
SWITCH 2 and DC SWITCH 3 to ON.
Step 5 Observe the LED indicators to check the SUN2000 operating status.
Step 6 Perform quick settings on the SUN2000 app. For details, see 7.1 Operations with
the SUN2000 App.
----End
SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
User Manual 6 Commissioning
Issue 15 (2023-01-31) Copyright © Huawei Technologies Co., Ltd. 80

Table of Contents

Other manuals for Huawei SUN2000-75KTL Series

Related product manuals