EasyManua.ls Logo

Huawei SUN2000-8KTL-M2 - 4.5.2 Support-mounted Installation

Huawei SUN2000-8KTL-M2
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.5.2 Support-mounted Installation
Prerequisites
Prepare M6 stainless bolt assemblies (including at washers, spring washers, and
M6 bolts) with appropriate lengths as well as matched at washers and nuts
based on the support
specications.
Procedure
Step 1 Determine the hole positions based on the marking-o template, and then mark
the hole positions using a marker.
Figure 4-13 Determining hole positions
Step 2 Drill holes using a hammer drill.
NO TE
You are advised to apply anti-rust paint on the hole positions for protection.
SUN2000-(8KTL-20KTL)-M2
User Manual 4 Installation
Issue 11 (2023-02-07) Copyright © Huawei Technologies Co., Ltd. 34

Table of Contents

Huawei SUN2000-8KTL-M2 - 4.5.2 Support-mounted Installation