EasyManua.ls Logo

Huawei UPS5000-A-30 kVA - Page 45

Huawei UPS5000-A-30 kVA
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 1-44 Engaging the mounting ears (front view)
(1) Scale (2) Mounting ear (3) Lower edge of a U scale
2. Partially tighten the front and rear ends of the guide rail using panel screws.
NO TICE
Do not fully tighten panel screws. This facilitates subsequent adjusting when
installing reinforced beams.
Figure 1-45 Securing a guide rail (front view)
Step 2 Install a stiening beam at the front and rear of the rack respectively. After the
installation is complete, tighten the panel screws that secure the guide rails.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide 1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd. 38

Other manuals for Huawei UPS5000-A-30 kVA

Related product manuals