EasyManua.ls Logo

Huawei UPS5000-A-30 kVA - Page 46

Huawei UPS5000-A-30 kVA
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 1-46 Installing a reinforced beam (front view)
Step 3 Use scale plates to determine the installation positions of oating nuts at the left
and right sides on the front of the rack, and install oating nuts.
NO TICE
Level the Bottom line on the scale plate with the lower edge of U sale 01 on the
rack. Install
oating nuts onto the mounting holes for the mounting bar that
corresponds to Hole location lines.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide 1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd. 39

Other manuals for Huawei UPS5000-A-30 kVA

Related product manuals