4.
2.
3.
1. BOOM VANG BALE
2. UPPER VANG FIDDLE BLOCK
3. VANG LINE
4. LOWER VANG BLOCK
5. VANG TOGGLE
5.
BOOM
50cc REEFING AND ROPE VANG ARRANGEMENT
CLEW
OUTHAUL
TYPI
AL REEFIN
PR
EDURE
TANDARD MA
T
NLY
. Head up into the wind.
. Ease the mainsheet and vang.
. Check the topping lift for adequate boom support.
.
ower t
e ma
n
a
ar
to t
e appropr
ate mar
an
snu
t
e
line with the stopper
. Tension the ree
ng line with the self-tailing winch until the
ree
clew is brought down to the boom. Appl
stopper and
tension the main hal
ard back up, ease the topping
lift
if needed
.
TYPI
AL R
PE VAN
IN
TALLATI
N:
.Att
h
n
in
t
ll th
l
w
r
ddle block on vang toggle
.Attach the vang upper
ddle block on vang bale of the boom.
.Run the vang line as shown in the
4.Continue to run the vang line through vang line block then after
wars to the deck organizer and to the designated sheet stopper
.
on
rm All attachments are Secure.