✆
01268 205 121
| www.hydraev.co.uk | sales@hydraev.co.uk
18
INSTALLATION
NAME DESCRIPTION QTY
Multimeter Checking the electrical connections and electrical parameters 1
Electric impact drill Drilling 1
Impact drill bit (Ø 14mm) Drilling 2
Tape measure (5m) Measurement 1
Level ruler Measurement 1
Crosshead screwdriver Unpacking 1
Pliers Unpacking 1
Wire Stripper Removing the insulation sheath / jacket 1
Terminal pressure line pliers Pressing the terminals 1
Bevel cutting pliers Cutting the cable 1
Light hammer Unpacking, tapping, adjustment 1
Carrying equipment Moving and hoisting charger 1
PVC tape and sheath Insulation tape and insulation cladding connection 1
Personal protection tools Ensuring the health and safety of operators 1
TOOL PREPARATION
STANDARD TOOLS