EasyManua.ls Logo

Hydro-Smart 115 - Exhaust Venting Requirements

Hydro-Smart 115
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
13Page
Exhaustventing‐
ThisisaCategoryIIIapplianceandmustbeventedaccordingly.Theventsystemmustbesealedairtight.
AllseamsandjointswithoutgasketsmustbesealedwithhighheatresistantsiliconesealantorULlisted
aluminumadhesivetapehavingaminimumtemperatureratingof350°F.Forbestresults,a
ventsystem
shouldbeasshortandstraightaspossible.
ThiswaterheaterisaCategoryIIIapplianceandmustbeventedaccordinglywithany4”vent
approvedforusewithCategoryIIIorSpecialBHtypegasvent.
Followtheventpipemanufacturer’sinstructionswheninstallingthe
ventpipe.
Donotcommonventthisappliancewithanyotherventedappliance(Donotterminatevent
into a chimney.If the vent must go through the chimney, the vent must run all the way
throughthechimneywithCategoryIIIapprovedorSpecialBHventpipe).
When
the horizontal vent run exceeds 5 ft., support the vent run at 3 ft. intervals with
overheadhangars.
The maximumlengthofexhaust ventpipingmustnotexceed50ft.(deducting5ft.foreach
elbowusedintheventingsystem).Donotusemorethan5elbows.
Diameter Max.No.ofElbow Max.VerticalandHorizontal(Total)VentLength
4” 5 50ft.
*Foreachelbowadded,deduct5ft.frommax.Ventlength.
No.ofElbows Max.VerticalorHorizontalLength
0 50ft.
1 45ft.
2 40ft.
5 25ft.
VentingIllustrations‐
HorizontalInstallationDiagram
VerticalInstallationDiagram
SidewallVent
Terminator
Wall
BackflowPreventer*
VerticalCondensationDrain**
Fordetailsofthe optionalitems,refertotheInstallationmanualforeachOptionalitem.
Roo
f
VerticalCondensation
Drain**
RoofFlashing
RainCap
BackflowPreventer*