EasyManua.ls Logo

HygroMatik C01 KIT - Maintenance Work

HygroMatik C01 KIT
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 42
8.1 Maintenance Work
Mineral deposits precipitate and crystallize very differently in dif-
ferent types of water, even when two types have the same con-
ductivity and hardness levels (the various constituents in the
water interact differently).
Instructions on maintenance and cleaning intervals, or on elec-
trode service life, are based entirely on empirical data.
In most cases, the conductivity levels given in Section 1.1
"Directions for Use" of these instructions can be considered nor-
mal. Individual parameter setting of the control may be neces-
sary.
In extreme cases, water pretreatment may be necessary (soft-
ening by dilution to approx. 4 - 8 °dH; decarbonization/partial
desalination to achieve target reductions in carbonate hard-
ness). HygroMatik would be pleased to refer you to companies
specializing in water treatment systems.
Cycle Maintenance Work
4 Weeks after
initial operation
(with normal
water quality)
Visual inspection of electrical and
mechanical connections
Remove mineral deposits from steam cyl-
inder, water drain hose and blow-down
pump
Check electrodes for erosion
Semiannually
(with normal
water quality and
"normal" opera-
tion = 8h/day)
Visual inspection of electrical and
mechanical connections
Remove mineral deposits from steam cyl-
inder, water drain hose and blow-down
pump
und ggf. erneuernCheck electrodes for
erosion

Related product manuals